Now we can really start to see the structure - it will move quickly from here. The posts, bearers and joists are made from steel. It is a great system that results in zero waste: the lengths of steel section are delivered, then cut to size, fitted and welded together on-site. All offcuts are returned to the steel fabricator to be recycled.
These pictures show the result of less than two days work.
By the end of this week we should have all the joists in place too, we hope.
Monday, June 14, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment