Monday, June 28, 2010

13. Good progress

In the two weeks since the last post, there were a few rainy days that slowed the progress a little.  Still, a lot has been done and the project is still ahead of schedule by about three weeks. The forecast is for a dry and sunny week, so full steam ahead!

Joists were installed,

then the beginning of the floor structure went down. This area is the en-suite bathroom - the lowered area is the shower.

The plumber started to put in some pipes,

The block work for the garage and pond was finished,

and the carpenters almost completed the plywood floor structure.

No comments: