This week we have had timber floor installation, painting, cabinetry installation, tiling, painting, electrical fitoff and door installation all happening.
Finished external colour scheme |
Kitchen cabinets |
More kitchen cabinets, waiting for stone benchtops |
Dining room / kitchen |
Study |
Bathroom cabinet and floor tiles |
En-suite cabinets and floor tiles |
Fruit trees; mango, avocados and three types of citrus |
Veggie beds built, and soil delivered |
Veggie beds; soil distributed and mulched. Marigolds planted to attract bees for pollination |
Next week, the tiling will be completed and the stone benchtops installed, allowing all the remaining plumbing and electrical fitoffs to be completed. Then the floor can be sanded and polished and we can move in!!!