Sunday, November 14, 2010

29. A lot happening

This week we have had timber floor installation, painting, cabinetry installation, tiling, painting, electrical fitoff and door installation all happening.

Finished external colour scheme







Kitchen cabinets

More kitchen cabinets, waiting for stone benchtops

Dining room / kitchen
Study

Bathroom cabinet and floor tiles

En-suite cabinets and floor tiles
Fruit trees; mango, avocados and three types of citrus

Veggie beds built, and soil delivered

Veggie beds; soil distributed and mulched. Marigolds planted to attract bees for pollination
Next week, the tiling will be completed and the stone benchtops installed, allowing all the remaining plumbing and electrical fitoffs to be completed. Then the floor can be sanded and polished and we can move in!!!